The enterprise operates in the spheres of electric power industry and heat power engineering. It is one of the main enterprises providing thermal energy and hot water to the objects of the housing and communal infrastructure of the city of Anzhero-Sudzhensk.
- 1901. The construction of the began.
- 1905. Steam engines of 150 horsepower each were installed. In November 1905, Anzherskaya Central Power Station produced the first 331 kW of generated electricity; its date of establishment was legalized then. This was how the first powerful power plant appeared in Siberia.
- 1911. A steam engine of 700 horsepower was installed, and the station's capacity increased to 625 kW. This allowed the Anzhero-Sudzhensk power engineers to generate up to 25,000 kW/h a year.
- 1920s. Funds for the reconstruction of the Central Electric Power Station were allocated in the state budget. A turbine hall was attached to the main building.
- 1927. The first turbine generator with a capacity of 1400 kW was assembled and launched; it began producing high voltage current.
- 1928. The second turbine generator with a capacity of 3000 kW was launched.
- 1931. The third turbine generator was installed.
- 1936. The station acquired a new function: supplying water to industrial enterprises and the population of the city.
- 1942. The reconstruction of the station began; it was completed in mid-1944.
- 1944. The station started providing the city with heat. The capacity of the power station increased by 5,154 thousand kW/h and reached 42.816 million kW of electricity in 1945.
- 1960. Electricity generation amounted to 55.44 million kW/h, and heat energy generation reached 35300 Gcal.
- 1962. The low-voltage network shop was separated from the structure of Anzherskaya Central Power Station, and a new organization called "Gorelektroset" appeared.
- 1972. It was decided to reconstruct the station and to cancel the production of electricity.
- 1973 - 2003. Major reconstructions were carried out, technology was improved, and latest developments were introduced.
- 2003. Under the program for the development of small-scale power generation in Kuzbass, the first turbine generator was installed at the station.
- 2005. The second power unit was put into operation.
- 2009 - 2010. A heat pipeline was constructed and put into operation in the southern district of the city, which allowed closing the unproductive low-power boiler houses and connecting more than 10,000 people to heating.
The social policy of the enterprise is based on caring for the employees of the station.
By successfully increasing its capacity, the company achieves stability, quality and reliability in work, many projects are being implemented.